1.
Management assigns you to be the project manager of a project that crosses functional lines and is designed to operate at 6-sigma levels.
管理层任命你为一个跨越职能部门的项目经理,项目将按照六西格玛水平执行。
2.
Duration is a week or two. 1st step is to educate the top management or executives on Lean Sigma awareness.
在此阶段周期通常为一周或者两周。第一步是培训高层管理者或者主管对于精益西格玛的认识。
3.
Qingdao Sigma is a set of visual arts photo, personalized wedding, commercial photography into a professional photography studio.
青岛格玛视觉是集艺术写真、个性婚纱、商业广告摄影为一体的专业摄影工作室。
4.
The bank's trading platform, known as Sigma X, has grown into a significant supplier of liquidity in the US, where it was launched in 2005.
该投行的这一交易平台被称作SigmaX,已成长为美国重要的流动性供应商,它是2005年在美国推出的。
5.
The goal is to ramp up to a point where the tangible savings is funding the Six Sigma program.
目标是跃进到某一点,在这一点有切实的积蓄来资助六西格玛项目。
6.
And with this table, the TMAP process is complete, and the Six Sigma project is off to a strong start.
这张表,TMAP过程完成之后,六西格玛项目有了一个强势的开局。
7.
In a similar way, the Lean Manufacturing and Six Sigma philosophies are parts of a healthy continuous-improvement program.
类似地,精益制造和六西格玛体系是健康连续改进项目一部分。
8.
The Six Sigma Black Belt should be able to measure progress towards the goals in terms meaningful to customers and leaders.
六西格玛黑带应该能够测量出朝着预期目标进展对顾客和公司领导的意义。
9.
Black Belts are the deep knowledge experts regarding Six Sigma techniques and help oversee and drive multiple Six Sigma projects at a time .
黑带是与六西格马技术有关的知识丰富的专家,并帮助监督并一次推动多个六西格马项目。
10.
Given a stable set of subgrouped data, the Six Sigma Black Belt should be able to perform a complete Process Capability Analysis.
给出一组稳定的分组数据,6西格玛黑带应能完成完整的过程能力分析。